Skip to content
DAT Supply Log in
Project entry

Start a DAT Supply project

Send a short brief and DAT will route it to the right working track — white-label, semi-custom or custom development. Reviewed by the manufacturing team, not an autoresponder.

Three working tracks

Pick a starting point — DAT confirms the route after the brief.

White-label route From 1,000 units

White-label formula

Pick a reviewed gummy concept from the catalogue and adapt brand artwork. Fastest path to a launch — packaging, claims and documentation reviewed against the target market.

Use this route in the brief →
Semi-custom route From 2,500 units

Semi-custom project

Adjust dose, flavour or active stack within an existing matrix. Differentiated SKU without a full custom-development cycle.

Use this route in the brief →
Custom development From 5,000 units

Custom development

Bespoke formulation, custom flavour profile and packaging dieline. The right route for category-defining launches with longer planning windows.

Use this route in the brief →
Brief inputs

What DAT needs to route the project

Project briefs are handled in the DAT portal. The wizard prompts for the inputs below — the more upfront context, the faster DAT can confirm feasibility and the right working route.

  1. 01
    Target market

    Primary distribution market and any secondary markets — drives label, claims and notification scope.

  2. 02
    Quantity

    Indicative MOQ tier and forecast for the launch window. Used to confirm route and packaging.

  3. 03
    Formula direction

    Positioning, active ingredients in scope and any non-starters. Custom development is reviewed against the brief.

  4. 04
    Packaging format

    PET bottle, doypack or sachet — pack format influences the production route and documentation set.

  5. 05
    Timeline

    Target launch window. Production calendar and raw-material lead times are confirmed in the quote.

  6. 06
    Claims & label requirements

    Any approved claim wording, regulatory framework, or label requirement you already need to honour.

Send your project brief

One short brief — DAT routes it from there.

Required fields are marked with an asterisk. Everything else helps the manufacturing team route the brief faster.

  • Reviewed by the DAT manufacturing team — expect a personal reply.
  • Once your brief has been reviewed, the team will respond.
  • Samples are released for qualified brand and white-label projects to evaluate texture, flavour and format before a commercial brief.
About you
Project intent
Volume, format & formula direction

Start typing a formula name, ingredient, or category — or leave blank if you want us to recommend a fit.

Project notes (optional)

By submitting, you agree to be contacted about this enquiry. DAT does not share your information with third parties. See the privacy policy.

What happens next

The portal owns the brief; the public site is for discovery.

Once your brief is received, DAT will reply with the right next step and (if the brief fits) deep-link the project into the portal workspace. Inside the portal the project moves through brief review, formula and spec confirmation, artwork and label review, production and QC, and batch-specific document release.

Before the brief

Know the market before you start

These guides cover the regulatory framework, claim review process and project timeline for private-label gummy launches.

A note on claims and compliance

DAT Supply manufactures food supplements only. On-pack health and nutrition claims must comply with EU Regulation 1924/2006 and the authorised list under EU 432/2012. Claim wording is reviewed per project. The brand owner remains the food business operator and is responsible for final filings in each target market. Documentation availability depends on product, market, and project stage.

Quick context request

Get manufacturing context

Drop your work email and a member of the DAT team will follow up with the right context for this concept. Project documents, certificates and pricing are released through the project workspace in the DAT portal.

You will receive a short confirmation email. Project documents (specification, batch-specific COA, packaging documents) are released through the project workspace in the DAT portal once a brief is in place.